What a week!  I sat down on Monday morning and put together a list of every single task I could think of that needed to be done before Hallowiki and despite being really pleased with our progress so far...it was a REALLY long list.  So I put together a schedule as best I could, based on what needed to be done and what time was available and I've been cranking hard on it all week.  Thankfully, things are coming along really nicely on the schedule.  Thanks to Jeff and Sarah's help yesterday and Jeff's help this morning, all of the big stuff that I was concerned about is done.  There are two things left to poly and attach and then after that it is just pub tables, decor stuff and little optional projects that don't have to be done by Hallowiki (and cleaning).

Progress lately: put shelves in the big upper cabinet, attached fridge trim, put another coat of poly on the bamboo trim and front bar top, cut the transition molding for the floor, cut and frosted the plexiglass for the ceiling fixture, mounted the dartboard, built the gate-stop, cut, stained, poly'd and mounted the oak trim to face the ceiling MDF, built and put up the stemware rack, wired up the display shelf lighting, updated the TikiLighting program to control them, installed the ceiling speakers, and put up the stats screen.
This site made possible by Perfect Pointe Dance Studio.
Quality dance classes for Arlington, Falls Church and McLean, VA